How to prepare a site for cabin delivery
Site preparation should make it possible to bring the cabin into the location, offload or deploy it safely, position it accurately and connect any agreed utilities. Access and placement planning should happen before the delivery vehicle arrives.
Access route
Confirm road width, turning space, overhead restrictions and entry points.
Placement area
Prepare a stable, level area appropriate to the cabin and intended use.
Utilities
Identify electrical, plumbing, drainage and AC requirements before final placement.
Working space
Allow enough clearance around the cabin for offloading, unfolding, assembly or connection work.
What information should you send with an enquiry?
- Cabin type or intended use
- Preferred size and quantity
- Origin and delivery destination
- Site access information
- Required utilities and interior options
- Target delivery or installation date